S-House affirms its position as complete house construction unit trusted and chosen by many investors 10+ years of experience, accompanying hundreds of families nationwide. With 1000+ impressive real-life projects from mansions, villas, townhouses, farmstays to hotels and offices of many different scales.
Own the team 80+ experienced architects and engineers, S-House deploys the service Complete design and construction package Standardized and strict professional process for each project. From the first consultation, to the design, to the day "turnkey", every item has a specific roadmap, helping investors easily track progress, control costs and coordinate throughout the construction process.
In today's market, Full house construction service There are many different price segments — from popular to high-end — depending on materials, team size and level of completion. S-House Focus on segment build high-end full-service houses, with the difference being transparency in volume, progress and newspaper Full detailed house construction price right from the start. This is the reason why many customers from Nha Trang, Ho Chi Minh City, Hanoi, to other provinces choose S-House as a companion for their projects.

The Mediterranean villa project was built as a whole by S-House
>>> See more: Top reputable construction design companies in Ho Chi Minh City
1. What is full house construction?
Build a complete house is form "turnkey" complete package from a to z — the investor signs a contract to deliver the entire contract to one design and construction company, from the concept and design stage to project completion and handover for use.
Instead of having to worry about each individual step yourself, when choosing pandemic full house construction service, the homeowner only needs to provide necessary documents and periodically monitor. Construction company will proactively implement all: applying for construction permits, architectural and structural design, interior design, cost estimation, rough construction and finishing, up to completion and handover.
In essence, build a complete house is a combination of multiple contracts in one:
+ Architectural and interior design contract
+ Rough construction contract
+ Completed construction contract
All wrapped up in one Full construction quote unifying to complete a project according to the original design, helping investors control the budget easily, minimizing unexpected occurrences and significantly saving time and effort compared to constructing each item individually.

Full construction quote at S-House
Full house building service at S-House Carry out all stages: survey → project preparation → quote → prepare materials → legal procedures → construction... until handover and liquidation of the contract. This service helps homeowners set up an appropriate budget, avoid unexpected problems, help the process housing design and construction went smoothly, Save time and effort, don't have to worry too much and still be able to own it beautiful house. Besides, the package construction quote is also more economical than constructing each item individually.
Super Product Unique 600m2 Modern Villa In Thanh Hoa - Build a house with flying package S-House
Xem trên YouTube
2. What does the full house building service include?
S-House understands that housing construction is an important and meaningful decision for every family. With the combination of top quality and reasonable prices, we hope to bring customers the best Complete home building solutions High quality, reliable and meets all their needs. At S-House, the full house building service covers everything from design to handover, combining high quality and reasonable prices, including the following items:
Detailed work Full house construction service as at S-House Implementation will include:
1. Consulting on budget, aesthetics, functionality and information about building a complete house.
2. Support construction permit applications and legal procedures.
3. Architectural profile design, 3D perspective.
4. Provide detailed construction estimates
5. Construction of rough and finished parts to high standards.
6. Complete design of interior profile
7. Production and installation of furniture
8. Consult on completion procedures.
| WORK CATEGORY |
SPECIFIC CONTENT |
| Design category |
+ Dossier for construction permit
+ Architectural design documents
+ Construction design documents
+ MEP electrical and water structure profile set - 3D perspective of facade and interior
+ 3D interior perspective
|
| Basic construction part |
-Organize the construction site, establish a labor safety corridor, and provide a resting place for workers (if the construction site allows).
-Survey the site, clean the site, locate landmarks and elevations of foundations and columns.
-Positioning and excavating foundations and underground drainage items: pile foundations, foundation beams, stirrups, septic tanks, manholes.
-Constructing foundation structures, pouring concrete, floor beams for floors and columns according to approved design drawings.
-Build walls according to design drawings, plaster floors according to standards.
-Laminate floors, terraces, roofs and toilets.
-Construction of waterproofing floors, toilets, terraces, balconies,...
-Construction of corrugated iron roof and tile roof (if any).
-Construction and installation of hot and cold water supply and drainage pipes.
-Construction and installation of lighting systems, sound bases, junction boxes.
-Construction and installation of cable TV and Internet systems.
|
| Finished part |
+ Facade: decorative stone, decorative materials, decorative iron panels and frames, railings...
+ Floor: Tiling materials, skirting boards, wooden floors
+ Doors: Interior doors and exterior doors
+ Paint: Apply primer and paint the entire house
+ Waterproofing: Waterproofing toilets, roof floors, exterior walls, flower beds, balconies
+ ME Sanitary Equipment & Electrical Equipment: Sanitary equipment, smart equipment (if any), air conditioning pipes, water tanks
+ Ceiling: Plasterboard ceiling, decorative paneled ceiling...
+ Stairs: Stone surfaces, wooden staircase surfaces, stair facades, stair railings and stair railings
+ Front and Back Yard: Front gate, protective frame, tiles/stones, poly rain cover if any...
+ Sky Well: Protective frame, tempered glass, wind intake
|
| Interior construction |
+ Living Room: Sofa, sofa table, TV shelf, decorative wall, decorative ceiling, partition, cabinet under the stairs, curtains...
+ Kitchen: Upper kitchen cabinets, lower kitchen cabinets, kitchen stone, thermal glass, LED lighting, kitchen accessories (finished shelves, dish shelves, mobile shelves, corner shelves, multi-purpose shelves, lift arms), dining table, dining chairs, decorative hanging shelves...
+ WC room: Mirror, cabinet, sink, decorative shelf, laundry shelf
+ Bedroom: Bed, wardrobe, clothes, dressing table, study table, chair, TV shelf, decorative shelf, decorative wall, curtain...
+ Common Living Room: tables, chairs, hanging shelves, bookshelves...
+ Altar room: altar, altar ceiling, decorative walls...
|
| Jobs not included |
+ Install decorative chandeliers and office LAN networks.
+ 3-phase electrical system, copper refrigeration.
+ Lightning protection and landscape construction. |

The foundation phase of S-House's project

Click to see full actual images of completed neoclassical Sunshine Villa
3. Why should you choose the full house building service at S-House
Service build a complete house is increasingly popular thanks to the outstanding benefits it brings. Below are the main reasons why you should choose this service to realize your dream home.
1. Own a perfect home
When using the service build a complete house, you will work with a team of experts from design to construction. They ensure that every step in the construction process is carried out synchronously, from design ideas to completion, helping you own a house that is not only beautiful but also ensures scientific functionality when used.
2. Get support for legal procedures
One of the great benefits of the service build a complete house is support for legal procedures. The professional team will help you complete necessary documents such as applying for construction permits, ensuring compliance with legal regulations, helping you avoid unnecessary problems.

When performing construction - S-House will support quick construction legal procedures
3. Save time and effort
Managing the stages of building a house yourself can be very time-consuming and labor-intensive. With service build a complete house, all work from planning, purchasing materials, construction to supervision is undertaken by the contractor. You just need to give your ideas and requirements, the professional team will take care of the rest.

4. Save money
Service build a complete house helps you control costs more effectively. The contractor will provide detailed and transparent quotes from the beginning, avoiding unexpected costs. Additionally, thanks to their experience and relationships with suppliers, they can purchase quality materials at better prices, giving you significant savings.

5. Easily control quality
Select Full house construction service will easily control the quality of the project. Technical requirements are shown on drawings, and are always followed by construction workers and carried out according to correct techniques. From choosing building materials to the construction process, everything is thoroughly checked, helping you feel secure about the durability and aesthetics of the house.

6. Limit the risks that arise when choosing to build a complete house
Problems such as delayed progress, technical errors or cost overruns often occur when building a house yourself. With service build a complete house, a team of experienced experts will help minimize these risks, ensuring the project is completed on schedule and with quality.

>>> Learn more about: Quotation for complete housing construction at S-House
4. Price quote for building a complete house in 2026 at S-House
S-House applies quotes according to 2 calculation methods: volume separation (for large projects) or calculation according to construction area. Initially, the investor will be given a preliminary quote by m² to determine the expected cost.
Note: This preliminary quotation method is only about 70-80% accurate compared to reality. After that, S-House will break down the detailed estimate according to the drawing or permit request, including reinforcement, cement, bricks, paint, labor, machinery... ensuring accuracy and transparency in the final quote.
The calculation formula is usually; Construction unit price x Construction area = Full house construction cost
+ Unit price to build a complete house (decent package): 12,000,000 VND /m2 - 15,000,000 VND /m2
+ Unit price to build a complete house (luxury package): 20,000,000 VND m2 - 30,000,000 VND /m2
Note: The price list for building a complete house is updated from time to time, so follow or contact S-House to receive the latest, most detailed price list.
The complete unit price depends on each construction package, the full house building service at S-House currently has 2 types:
+ Design and construction of townhouse packages
+ Design and construction of complete villa packages
See more: Package construction unit price 2026 at S-House
Method of calculating construction area
The unit price for building a complete house is calculated on the actual construction area - and this area is not simply the usable floor area, but is converted according to a separate coefficient for each area: Depending on the area and scale of the project, there will be different ways to calculate the area coefficient. You can refer to and calculate your own construction costs for your house based on the coefficients applied when building a complete house below.
| Construction area |
Calculation coefficient |
| Foundation area: house foundation, fence, garden |
90% area |
| Floor area of 2nd floor |
100% area |
| Floor area of 3rd floor |
100% area |
| Roof floor area |
100% area |
| Floor area of the staircase |
100% ground floor area |
| Construction of surrounding walls on the roof (construction of walls, pouring of wall braces) |
100% ground floor area |
| Fence area (not including brick and stone materials) |
100% ground floor area |
| Garden area (excluding trees, paving stones, and planting land) |
100% area |
The foundation is the item with the most flexible calculation, depending directly on the structural solution chosen for the project:
+ Construction solution for Mong Bang foundation (excluding Melaleuca piles if any), the foundation is calculated at 50% of the ground floor area.
+ Pile foundation construction solution (excluding reinforced concrete piles), the foundation accounts for 30% of the ground floor area. If pouring concrete on the ground floor, the foundation is calculated as 50% of the ground floor area.
+ Raft foundation construction solution (excluding Melaleuca piles if any), the foundation is calculated at 50% of the ground floor area.
+ Single foundation construction solution (excluding Melaleuca piles if any), the foundation is not included.

Building a complete neoclassical villa with over 1000 square meters and an investment of over 50 billion - Click to see full actual images
Factors affecting the unit price of a full house construction service
House construction costs is a factor that is always of top concern. However, there are many levels in the market construction unit price different. Therefore, the unit price of building a house will depend on many different factors, leading to different unit prices.
1. Depends on area and construction conditions
To transport construction materials to construction sites, construction units often need roads wider than 5m to easily move by large vehicles, instead of having to transport them many times by small vehicles, which is costly. The unit cost of transporting into alleys and narrow roads will be higher due to the need for more equipment and labor, and may even affect rush hour traffic.
In addition, difficult construction conditions such as small premises, difficult to collect materials and equipment... will also affect construction costs. Therefore, if construction conditions are difficult, the access road is small or the construction area is small, the price of building a complete house will be higher.
2. Depends on construction method
Each contractor will have a different construction method. Professional construction units will apply construction technologies to ensure labor safety for the project. A professional construction unit with a thorough plan will deliver a higher quality project, with a faster construction time than an inexperienced unit.
3. Depends on construction materials
Choosing construction materials is also a factor that affects the price of building a complete house because different material sources often have different unit prices. Good quality materials will be more expensive. Normally, the construction unit will advise on materials suitable to the customer's budget to have the most suitable price while still ensuring quality.

4. Depends on the reputation and quality of construction of the construction unit
Well-known units with highly skilled and experienced teams and using machines instead of traditional manual methods often have higher unit prices, corresponding to the quality and accuracy of the project. In addition, additional quotes may arise in the following cases: the investor requests to change construction materials in the middle of the process, the initial quote lacks items due to the contractor's lack of experience, or the investor requests to add new items that are not included in the quote.
Criteria to evaluate the quality of a construction unit:
+ A construction team with high skills and correct techniques will have a higher price than low-skilled and negligent workers.
+ Using machines will be more effective than traditional manual mortar mixing.
+ Engineers with specialized knowledge and extensive experience are also factors that determine the construction progress and quality of the project.

In addition, quotes will arise in the following cases:
+ The investor requests to change construction materials during the construction process.
+ The quote is missing items due to the contractor's lack of experience.
+ The investor requests to add new items that are not included in the quote.

The modern villa has been completed and handed over
>>See more: Hanoi Construction Design Company Reputable and Top Quality
5. Full house construction process
Investors should understand complete house building process to coordinate effectively with contractors, avoid passivity and easily grasp the job overview. Below is the service's professional 9-step process Build a complete house at S-House:

Step 1: Receive information: Contact hotline/office, send legal documents for initial consultation.
Step 2: Actual survey: Technicians measure and advise on full house building services according to ideas.
Step 3: Design quote: Make a design plan, optimize costs and functions.
Step 4: Prepare design documents: architectural drawings (plan, 3D), structure, electricity, water, MEP.
Step 5: Construction estimate: Analyze costs accurately, quote prices separately for rough/finished parts.
Step 6: Sign the contract: Agree on terms and start construction.
Step 7: Interior design: 3D perspective, construction drawings after rough acceptance.
Step 8: Interior quote: Calculate production and installation costs based on the approved design.
Step 9: Acceptance & handover: cleaning, completion, contract liquidation, long-term warranty.
6. Legal procedures when building a complete house
Ask for permission to build This is the first step when you want to build a house. When used Use full house construction services, procedures for applying for construction permits and legal documents will be handled by construction company Proceed quickly and professionally on behalf of the homeowner.
When preparing to apply for a construction permit, you need to prepare the correct application documents for a construction permit The law regulates individual houses:
+ Application for construction permit
+ Notarized copy of land use rights documents, accompanied by a copy of the household owner's ID card
+ Preliminary design with design company stamp and architect/construction engineer signature
+ Business license of the design company
+ Architect practicing certificate of the main designer
+ Commitment of adjacent works
+ Commitment to self-destructing temporary construction works located in the planning area (if any)
+ Official letter and drawing of model house if it is a house in the project
Some cases of individual houses are exempt from construction permits according to current law provisions — investors should check specifically with the construction unit or local management agency before implementation.

Housing design and construction in urban areas need to comply with the regulations of the urban area
In cases where houses are exempt from construction permits, learn more at Law on individual housing

Housing design and construction in urban areas need to comply with the regulations of the urban area
7. Important notes when building a complete house
Building a complete house is a popular solution that helps homeowners save time and effort when building a home. S-House - reputable construction company, Professionals will give you important notes to ensure the entire house building process goes smoothly.

1. Cost estimation
To be able to build a perfect house, consideration must first be given What is the investment level? Plan your expenses in advance, because construction costs will affect the entire scale, aesthetics and level of completion of the project. An additional 5-10% of the budget should be budgeted for design changes or additional requests.
2. Design documents
Design documents are the foundation for implementing construction and ensuring the project meets aesthetic and technical standards. Usually, the units provide Full house construction service are responsible for both design and construction. S-House Provide a set of design documents including architectural drawings (plans, elevations, sections, 3D perspectives), structural drawings and drawings of electricity, water and network systems. Ensure design documents meet construction permit requirements according to local regulations, including construction permits and related documents.
3. Construction contract
Construction contract is an important legal document, playing a role in binding responsibilities, costs and realizing commitments between two parties. Some items in the contract should be noted such as:
+ Clear terms: The contract should detail the construction progress, types of materials (eg bricks, paint, cement...), unit price and work items. S-House Outstanding with separate contracts (design, rough construction, finishing, interior), helping homeowners easily control each stage.
+ Expenses incurred: Clear agreement on how to handle incurred costs. VFor example, when changing design or materials, it is necessary to agree on the contract addendum before making changes.
+ Progress and warranty: Make sure the contract clearly states completion time and warranty policy. Construction on schedule and material quality guaranteed.
+ Project acceptance: Before payment, carefully check each item (raw parts, finishing, interior) and requirements construction unit Provide acceptance minutes.

4. Choose a reputable contractor
Currently on the market there are quite a few units Full house construction quote, therefore, before deciding to choose a contractor, it is necessary to consider and consult many different units. The more references there are, the more choices and comparison opportunities there will be to choose the right unit. This is very important and almost determines the quality of the house. Choosing a reputable construction contractor will make investors feel more secure when entrusted to build their house.

8. Top complete house construction projects S-House have been completed and handed over
S-House is Full house construction company leading, putting customers first with a commitment to high quality, professionalism and extensive industry experience. With a team of dedicated and experienced architects, engineers and craftsmen, we are more than just general construction contractor but also a reliable partner, ready to accompany customers from design to completion of every project.
S-House is proud to carry a wide range labour actual submission From North to South, the entire package has been completed, from design to interior construction, and turnkey handover to customers. Each project is handed over on schedule, with the right quality, on budget, bringing absolute satisfaction to the homeowner. These projects not only affirm professional capacity, experience, working process professionally but also through understanding the needs and desires of each customer, thereby consulting and implementing every project in the most dedicated way.
Below are some projects build a complete house Typical examples that S-House has successfully implemented, bringing absolute satisfaction to the homeowner:
1. Build a complete villa - a luxury, million-dollar mansion
At S-House, perfection and uniqueness created a brand. S-House specializes in implementing villa projects with large spaces and many styles: modern, neoclassical, Indochine, and luxury garden houses. Each project is carried out methodically, with exquisite details, creating outstanding class.
Neoclassical mansion 3000m2 - An Chateau
An Chateau is a project mansion neoclassical has a total area of more than 3,000 m², designed and fully constructed by S-House for a businessman in the car business. Magnificent building with central swimming pool, luxurious neoclassical interior, symbol of the upper class. From drawing to reality, S-House turned the idea into a splendid super villa, completed beyond expectations.

Complete design and construction of a 3-storey neoclassical mansion with a total area of more than 3000m2 in Phu Yen'

Design and construction of a complete neoclassical interior package for the mansion
Neoclassical villa of more than 1000m2 - Sunshine Villa
Owning a corner plot of nearly 300 m², S-House has designed and constructed an impressive and majestic neoclassical European villa with a floor area of more than 1000 m². The project has created an outstanding mark that has caused fever in the HOUSE ADDICTION community for a long time. After 3 years, the sophisticated European neoclassical architecture becomes more beautiful over time.

S-House is proud to be a prestigious, high-class villa design and construction unit
Modern townhouse in Ha Quang - Nha Trang urban area

All are done methodically, creating unique and classy villas. Please refer to some completed villa projects from interior construction to architecture of S-House.
See more: Top 10 townhouse villa models that S-House has completed most impressively
2. Building a complete townhouse - Optimal solution for urban areas
With narrow facades and limited space in crowded urban areas, S-House offers innovative design, making the most of every square meter. Full house construction service from architecture to modern interior, ensuring functionality, aesthetics and safety.
Modern 2-storey tube house in Phuoc Long urban area, Nha Trang

Beautiful 2-storey tube house model in Phuoc Long Nha Trang urban area

Beautiful modern townhouse with unique modern townhouse interior
Modern townhouse for multi-generational families more than 500m² in Khanh Hoa
Optimize common living space, harmoniously combine tradition and modernity

Building a modern house for multi-generational families with a total area of more than 500m2 in Khanh Hoa
3-storey townhouse in VCN Phuoc Hai urban area

S-House designed and built a modern 3-storey townhouse in VCN Phuoc Hai urban area
Modern 3-storey townhouse with religious imprints in Ba Lang - North Nha Trang Ward

Design and construction of a modern 3-storey townhouse package in Nha Trang
Modern townhouse in Vinh Tan urban area, Nghe An

Beautiful modern house design in Vinh Tan Nghe An urban area
From work renovate old house to full interior construction, each project of S-House is a perfect combination of function, aesthetics and safety. We are meticulous in every detail, aiming to maximize the potential of every square meter.
3. Level 4 house
A level 4 house is a smart choice for families who want to save money but still own a classy living space. S-House turns a level 4 house into a "resort-in-home" with flexible design and diverse styles. The model of a level 4 house in Tropical Modernism style combines tropical modernity, open space to receive natural wind, creative interior, bringing a feeling of relaxation right at home - proving that a level 4 house can be impressive, luxurious and at a more reasonable cost than a multi-storey townhouse or villa.

Tropical Modernism style 4-level house combined with resort-in-home
4. Building housing combined with business
The trend of housing combined with business is increasingly popular in urban areas. S-House optimally designs the business facade while still ensuring private living space. Like the neoclassical townhouse project combined with a beauty spa below. Possessing an impressive facade, classy interior, it is both an effective business and a perfect family home. On a land area of 7x 25m, S-House has created an impressive European-like space in the heart of the city.

Neoclassical townhouse model combined with beauty spa business
9. Important notes when making a package house construction contract
Sign a package house construction contract is the final agreement step before starting construction. This is the stage where the investor and contractor agree and are responsible for the terms. However, while constructing a house, errors and unexpected incidents cannot be avoided. Therefore, investors need to carefully check the contract before signing. Below are points to check carefully before signing.
Cost estimation
Before construction, it is necessary to clearly determine the expected investment level, because costs directly affect the scale, aesthetics and level of completion of the project. An additional 5-10% of the budget should be budgeted for design changes or additional requirements that arise during construction.
Design profile
Design documents are the foundation for implementing construction according to technical and aesthetic standards. Full house building service at S-House Provide full architectural drawings (plans, elevations, sections, 3D perspectives), structural drawings and electrical, water, and network systems - meeting construction permit requirements according to local regulations.
Raw and finished materials table
Construction materials will affect the unit price of house construction and directly affect the quality of the house. This is the factor that determines the sturdiness and durability of the house. Therefore, construction materials are always the top concern of customers in discussions and consultations with contractors.
Construction materials directly affect house construction unit price and the quality of the house, is the deciding factor in the sturdiness and durability of the project. Before signing, the investor needs to carefully review the material table (quantity, unit price, type) in the contract, because errors or mistakes may occur during the drafting process.
Construction contract
+ Clear terms: Compatible The contract should detail the progress, type of materials, unit price and work items. S-House uses separate contracts for each stage (design, rough construction, finishing, interior) so that the investor can easily control.
+ Costs incurred: Clearly agree on how to handle design/material changes — need to agree on the contract addendum before implementation.
+ Progress and warranty: To avoid unnecessary conflicts during the construction process, it is best for the homeowner and the investor to agree on the construction progress in the full house construction contract (specifying construction time, number of workers, penalty for delay) and material quality warranty policy.
+ Project acceptance: Carefully check each item (rough, finished, interior) before payment, request an acceptance record.
Payment progress
There are 2 popular forms:
+ By each category: Payment upon completion of each item as committed in the contract, helping investors easily monitor progress and quality.
+ By week/month: Often applied to small contractors, but more limited because it is difficult to closely control progress.
Payment according to each progress phase helps the investor control expenses well, while forcing the contractor to perform the construction correctly before receiving the next advance.
Choose a reputable contractor
Currently on the market there are quite a few units that quote prices for building a complete house. Before deciding, you should consult many different units - comparing capacity, actual project records and contract transparency almost directly determines the quality of the future house.
10. Frequently asked questions about building a complete house
Is building a complete house more economical than building it yourself?
Have. Because the investor only works with a single unit, avoiding intermediary costs when hiring many individual contractors, while taking advantage of the material relationship and optimal process of the construction unit.
How long does it usually take to build a complete house?
Time depends on the scale of the project, structural solutions and level of completion. Townhouses usually take a few months to more than a year; Large-scale villas may take longer — the specific time will be clearly stated in the construction contract.
Does the quote for building a complete house include furniture?
Depends on service package. At S-House, the contract is separated into each phase (design, rough construction, finishing, interior) so that the investor can proactively choose and control the budget for each part.
Do I need to prepare anything before signing a contract to build a house?
Investors should prepare legal documents related to land, clearly determine the expected budget (with 5-10% of the expected cost) and consult many construction units to compare before deciding.
Does building a package house provide support for construction permits?
Have. This is one of the core items of the service - the construction unit will prepare and submit all relevant legal documents on behalf of the homeowner.
If you are looking for a full house building service, consider factors such as location, scale and materials to optimize costs. Don't hesitate to request a detailed 2026 home construction quote from many contractors to compare and make the best choice for your dream home. We are ready to accompany you!
See more: Beautiful house design S-House and top impressive projects implemented
If you need design advice, please contact us now hotline 0866 006 060 or leave information via: https://nhadepshouse.com/nhan-mau-thiet-ke/. S-House will quickly contact you within 24 hours.
------------------------------
S-HOUSE JOINT STOCK COMPANY – Vietnam's leading ARCHITECTURAL DESIGN - INTERIOR AND CONSTRUCTION PACKAGE brand. With a system of 4 strategic branches from North to South, we have affirmed our position with 10 years of experience and more 1,000 design and construction projects outstanding in uniqueness and quality. S-HOUSE ready to accompany elite homeowners to create projects UNIQUE ARCHITECTURE nationally and internationally. Contact S-House today to create your dream living space into reality!
Hotline: 0866 006 060
E-mail: nhadepshouse@gmail.com
Branch system nationwide:
► In the city. HCM: No. 280A1, Luong Dinh Cua Street, An Phu Ward, District 2, Ho Chi Minh City
► In Nha Trang: No. 62A - 62B, Phan Chu Trinh Street, Van Thanh Ward, City. Nha Trang, Khanh Hoa
► In the city. Vinh: No. 19, An Duong Vuong Street, Truong Thi Ward, City. Vinh, Nghe An
► In Hanoi: D49-01 LK7 Geleximco Le Trong Tan, Duong Noi Ward, Hanoi